ISRO Program

India's Space Program: From Aryabhata to the Lunar South Pole

The Indian Space Research Organisation (ISRO) has grown from a single Soviet-launched satellite in 1975 into a nation that has landed near the Moon's south pole, reached Mars on its first attempt, and is preparing to fly its own astronauts.

1969
ISRO Founded
4th
Nation to Soft-Land on the Moon
1st
Landing Near Lunar South Pole
63
PSLV Launches (58 Successes)

Program Timeline

From India's first satellite to a historic lunar landing and a planned crewed spaceflight, each milestone built the capability for the next.

Completed August 15, 1969

ISRO Founded

Duration
Ongoing — 55+ years
Crew
N/A
Vehicle
N/A
Destination
Bengaluru, India (HQ)

The Indian Space Research Organisation was established on August 15, 1969, succeeding the Indian National Committee for Space Research (INCOSPAR), which physicist Dr. Vikram Sarabhai had set up in 1962 at the urging of Prime Minister Jawaharlal Nehru. Placed under the newly formed Department of Space, ISRO was tasked with using space technology for national development -- communications, remote sensing, and eventually launch vehicles and planetary exploration.

Key Facts

  • Succeeded INCOSPAR (established 1962)
  • Founded under Dr. Vikram Sarabhai’s vision
  • Headquartered in Bengaluru, Karnataka
  • Operates under India’s Department of Space
Completed April 19, 1975

Aryabhata: India’s First Satellite

Duration
Operated ~4 months (power failure)
Crew
Uncrewed
Vehicle
Soviet Kosmos-3M (from Kapustin Yar, USSR)
Destination
Low Earth orbit

Named after the 5th-century Indian astronomer, Aryabhata was India’s first satellite -- designed and built by ISRO, but launched by the Soviet Union under a cooperative agreement since India had no orbital launch vehicle of its own yet. A power system failure cut its scientific operations short, but the mission proved India could design and build a working spacecraft, laying the groundwork for an indigenous satellite program.

Key Facts

  • India’s first satellite
  • Launched aboard a Soviet rocket
  • Named for the ancient mathematician-astronomer Aryabhata
  • Foundation for India’s satellite program
Completed 1993–1994

PSLV Becomes Operational

Duration
In service 30+ years
Crew
Uncrewed
Vehicle
PSLV
Destination
Polar / Sun-synchronous orbit

The Polar Satellite Launch Vehicle debuted on September 20, 1993, but an attitude-control fault caused a stage collision and the payload failed to reach orbit. The very next flight, in October 1994, succeeded, and PSLV went on to become ISRO’s most reliable workhorse. As of early 2026 it had flown 63 missions with 58 full successes, one partial failure and four outright failures -- a record that made it the vehicle of choice for Chandrayaan-1, the Mars Orbiter Mission, and dozens of foreign satellite launch contracts.

Key Facts

  • First flight failed (Sept 1993); second flight succeeded (Oct 1994)
  • 63 launches, 58 full successes as of Jan 2026
  • Launched Chandrayaan-1 and the Mars Orbiter Mission
  • Workhorse of India’s commercial launch business
Completed October 22, 2008 – August 2009

Chandrayaan-1: First Lunar Probe

Duration
312 days (of a planned 2 years)
Crew
Uncrewed
Vehicle
PSLV-XL (C11)
Destination
Lunar orbit

India’s first mission beyond Earth orbit carried 11 instruments from India and international partners including NASA and ESA. Its Moon Impact Probe detected signs of water during descent in November 2008, and NASA’s Moon Mineralogy Mapper aboard the orbiter confirmed water molecules across the lunar surface in 2009 -- a discovery that reshaped scientific understanding of lunar resources. Contact was lost in August 2009 after 312 days, but ISRO judged the mission a success, having completed roughly 95% of its objectives.

Key Facts

  • Helped confirm water molecules on the Moon
  • Carried instruments from NASA and ESA
  • Completed about 95% of mission objectives
  • India’s first mission beyond Earth orbit
Completed November 5, 2013 – 2022

Mars Orbiter Mission (Mangalyaan)

Duration
~7.5 years at Mars (vs. 6-month plan)
Crew
Uncrewed
Vehicle
PSLV-XL (C25)
Destination
Mars orbit

Launched November 5, 2013 and inserted into Mars orbit on September 24, 2014, the Mars Orbiter Mission made India the first Asian nation to reach Mars, and only the fourth space agency to do so at all, after the Soviet program, NASA and ESA. Built for roughly ₹450 crore (about $73 million), it remains one of the least expensive interplanetary missions ever flown. It also succeeded on its very first attempt at Mars -- a feat previously managed only by the multinational European Space Agency, making it the first single nation’s mission to succeed on a maiden try. ISRO lost contact with the spacecraft in 2022 after its propellant was exhausted, roughly seven years past its planned six-month mission.

Key Facts

  • First Asian nation to reach Mars orbit
  • Succeeded on its first attempt — a rare feat
  • Cost about $73 million, among the cheapest Mars missions ever flown
  • Operated ~7.5 years, far beyond its planned lifetime
Completed December 2014 – June 2017

GSLV Mk III / LVM3 Debuts

Duration
In service 9+ years
Crew
Uncrewed (test flights)
Vehicle
GSLV Mk III / LVM3
Destination
Geosynchronous transfer orbit / LEO

India’s heaviest launch vehicle first flew as a suborbital experimental mission on December 18, 2014, testing atmospheric re-entry of a crew-module prototype (CARE). Its first fully orbital flight came June 5, 2017, carrying the GSAT-19 communications satellite. Capable of lifting about 10 tonnes to low Earth orbit and 4.2 tonnes to geosynchronous transfer orbit, the rocket -- since renamed LVM3 -- launched Chandrayaan-3 to the Moon in 2023 and is being human-rated for the crewed Gaganyaan program.

Key Facts

  • First (suborbital) flight tested a crew-module re-entry design
  • First orbital flight: GSAT-19, June 2017
  • Launched Chandrayaan-3 to the Moon in 2023
  • Being human-rated for Gaganyaan
Completed July 22, 2019 – September 6, 2019

Chandrayaan-2

Duration
Orbiter still active (7.5-year design life)
Crew
Uncrewed
Vehicle
GSLV Mk III (LVM3 M1)
Destination
Lunar orbit + surface (attempted)

Chandrayaan-2 launched July 22, 2019 carrying an orbiter, the Vikram lander, and the Pragyan rover. The orbiter reached lunar orbit successfully and remains operational today, but Vikram deviated from its intended trajectory about 2.1 km above the surface during its September 6, 2019 landing attempt and crashed. A failure analysis pointed to a software issue combined with higher-than-expected engine thrust. The lessons learned directly shaped the redesign that made Chandrayaan-3 successful four years later.

Key Facts

  • Orbiter succeeded and remains operational
  • Vikram lander crashed during final descent
  • Failure analysis directly informed Chandrayaan-3’s redesign
  • Carried the Vikram lander and Pragyan rover
Completed 2014–2023

Gaganyaan Uncrewed Test Campaign

Duration
Multiple test flights
Crew
Uncrewed (crew-module tests)
Vehicle
LVM3-X (CARE); Test Vehicle (TV-D1)
Destination
Suborbital

Ahead of Gaganyaan’s crewed flights, ISRO ran a series of uncrewed qualification tests: the Crew Module Atmospheric Re-entry Experiment (CARE) on December 18, 2014, verified re-entry aerodynamics and the heat shield; a pad abort test on July 5, 2018, demonstrated the crew escape system firing directly off the launch pad; and Test Vehicle Abort Mission-1 (TV-D1) on October 21, 2023, fired an abort motor at Mach 1.2 to simulate an in-flight emergency, successfully separating and recovering the crew module by parachute in the Bay of Bengal. An uncrewed orbital test, Gaganyaan-1, carrying the humanoid robot Vyommitra, has slipped past its original late-2025 target.

Key Facts

  • CARE re-entry test (December 2014)
  • Pad abort test (July 2018)
  • TV-D1 in-flight abort test (October 2023)
  • Uncrewed orbital test Gaganyaan-1, carrying humanoid robot Vyommitra, still pending
Completed July 14 – August 23, 2023

Chandrayaan-3: Historic South Pole Landing

Duration
~14 Earth days of surface operations
Crew
Uncrewed
Vehicle
LVM3 M4
Destination
Lunar south pole (Statio Shiv Shakti)

Chandrayaan-3 launched July 14, 2023, and on August 23, 2023 at 18:04 IST its Vikram lander touched down at Statio Shiv Shakti near the lunar south pole (69°S, 32°E) -- the first spacecraft in history to soft-land in that region, and only the fourth national space program, after the Soviet Union, the United States and China, to achieve any soft lunar landing. The Pragyan rover explored the surface for about two weeks before lander and rover entered planned hibernation as the two-week lunar night set in; they did not wake as hoped, but the mission had already met its objectives. India now marks the landing anniversary, August 23, as National Space Day.

Key Facts

  • First spacecraft to soft-land near the lunar south pole
  • India became the fourth country to achieve a soft Moon landing
  • Landing date (August 23) now observed as India’s National Space Day
  • Propulsion module remained active in high Earth orbit afterward
Completed September 2, 2023 – January 6, 2024

Aditya-L1 Reaches Solar Orbit

Duration
Operational, ongoing
Crew
Uncrewed
Vehicle
PSLV-XL (C57)
Destination
Sun-Earth L1 halo orbit (~1.5 million km from Earth)

India’s first dedicated solar observatory launched September 2, 2023 and, after a 126-day journey, entered a halo orbit around the Sun-Earth Lagrange Point 1 on January 6, 2024. From that vantage point, clear of eclipses, Aditya-L1 continuously observes the solar corona, solar wind and magnetic storms with seven instruments. It has since recorded major solar flares and coronal mass ejections and released tens of terabytes of data to researchers studying how solar activity affects Earth’s magnetosphere.

Key Facts

  • First Indian mission to study the Sun
  • Reached L1 halo orbit after a 126-day journey
  • Observing solar flares and coronal mass ejections
  • Over 27 TB of data released to researchers as of 2026
Completed July 30, 2025

NISAR: NASA-ISRO Radar Satellite

Duration
Operational (fully operational since January 2026)
Crew
Uncrewed
Vehicle
GSLV F16
Destination
Sun-synchronous polar orbit

NISAR (NASA-ISRO Synthetic Aperture Radar) pairs a NASA L-band radar with an ISRO S-band radar on a single satellite, making it one of the most capable Earth-observation missions ever built. It launched July 30, 2025 aboard a GSLV F16 -- the rocket’s first flight to a Sun-synchronous polar orbit -- and was declared fully operational in January 2026. NISAR maps ground and ice deformation, soil moisture and vegetation biomass worldwide roughly every 12 days, with data shared freely for disaster response and climate research.

Key Facts

  • Joint NASA-ISRO mission, first of its kind at this scale
  • Launched on a GSLV, ISRO’s heaviest routine launcher
  • Declared fully operational January 2026
  • Free, global radar imaging roughly every 12 days
Planned NET 2027

Gaganyaan: First Crewed Flight

Duration
Up to 7 days in orbit
Crew
2–3 Vyomanauts (TBD from 4 astronaut-designates)
Vehicle
Human-rated LVM3 (HLVM3)
Destination
Low Earth orbit (~400 km)

Gaganyaan will be India’s first crewed orbital spaceflight, carrying Indian astronauts -- called Vyomanauts -- in a roughly 5.3-tonne capsule launched on a human-rated LVM3. Four Indian Air Force test pilots were named astronaut-designates in February 2024; one of them, Group Captain Shubhanshu Shukla, gained early spaceflight experience by flying to the International Space Station on Axiom Mission 4 in June 2025, becoming only the second Indian in space. Originally targeted for 2021, the program has slipped through pandemic delays, supply-chain issues and the demands of indigenous life-support development. An uncrewed orbital test (Gaganyaan-1), carrying the humanoid robot Vyommitra, is expected to precede the crewed flight, which is now planned for no earlier than 2027.

Key Facts

  • Four IAF test pilots named astronaut-designates in February 2024
  • Shubhanshu Shukla flew to the ISS on Axiom Mission 4 (2025) in preparation
  • Uses a human-rated LVM3 (HLVM3) capsule
  • First crewed launch expected no earlier than 2027

Launch Vehicles & Spacecraft

ISRO built its own family of launch vehicles after early reliance on Soviet rockets, culminating in indigenous cryogenic technology and a heavy-lift rocket now being human-rated for crewed flight.

PSLV

Workhorse launcher

Polar Satellite Launch Vehicle. 63 launches since 1993, 58 full successes. Launched Chandrayaan-1, the Mars Orbiter Mission and Aditya-L1, plus hundreds of Indian and foreign satellites.

GSLV Mk III (LVM3)

Heavy-lift rocket

India’s heaviest operational launcher: ~10t to LEO, ~4.2t to GTO. Launched Chandrayaan-3 in 2023 and is being human-rated for Gaganyaan.

GSLV Mk II

Medium-lift, geosynchronous

Uses an indigenous cryogenic upper stage developed after foreign technology transfer was blocked in the 1990s -- one of only a handful of nations with this capability. Launched NISAR in 2025.

Vikram (Chandrayaan-3)

Lunar lander

Named after Dr. Vikram Sarabhai. Touched down near the lunar south pole on August 23, 2023, deploying the Pragyan rover.

HLVM3

Human-rated launcher (Gaganyaan)

Modified LVM3 with a stretched cryogenic stage, enhanced safety systems and a crew escape system, being developed to launch India’s first crewed orbital mission.

India's Commercial Space Sector

India's 2020 space policy reforms opened launch and satellite work to private industry, spinning up a new generation of startups alongside ISRO's commercial arm.

NewSpace India Limited (NSIL)

ISRO’s commercial arm: sells launch services, builds satellites for customers, and transfers ISRO technology to industry.

IN-SPACe

Regulator created in 2020 to authorize and promote private-sector launches, satellites and space infrastructure in India.

Skyroot Aerospace

India’s first private company to reach orbit, with its Vikram-1 rocket in July 2026, after its suborbital Vikram-S flight in 2022.

Agnikul Cosmos

Chennai-based startup behind Agnibaan, whose SOrTeD test in May 2024 flew the world’s first rocket powered by a single-piece 3D-printed engine.

International Cooperation

A Frugal Program with Global Reach

ISRO is known for "frugal engineering": the Mars Orbiter Mission cost about $73 million, and Chandrayaan-3 an estimated $75 million -- a fraction of comparable Western missions. That cost efficiency, paired with the reliable PSLV, has made ISRO a launch provider of choice for smaller nations, with commercial arm NewSpace India Limited (NSIL) having launched satellites for dozens of countries.

India also partners directly with other agencies: NISAR (2025) is a joint mission with NASA, Chandrayaan-2's orbiter carried NASA instrumentation, and astronaut Shubhanshu Shukla trained with NASA and SpaceX ahead of his 2025 Axiom Mission 4 flight to the ISS -- experience ISRO is drawing on as it prepares Gaganyaan. India's Artemis Accords signature in 2023 also ties its lunar ambitions to the same international framework guiding NASA's Artemis program.

$75M
Chandrayaan-3 Estimated Cost
A fraction of the cost of
comparable Western
lunar missions

Related Content

See how ISRO's program compares to other national space efforts and explore the wider Indian space ecosystem.